QUOTECLERK AI BLOG / US DISTRIBUTORS
Quantity breaks on a quote, done right
Quantity breaks look simple on a price sheet. Buy 1 to 9 at one price, 10 to 49 at a lower price, 50 and up at the lowest. On a contractor quote with many lines, several price dates and an account price in the mix, a quantity break is an easy place to get a line wrong without noticing.
Here is how I think about getting breaks right, line by line, whoever or whatever builds the quote.
What a break actually is
A quantity break says: from this quantity upward, this price applies. The key word is "from". A break at 50 means 50 or more. A line for 49 does not qualify, however close it is. A line for 120 uses the highest break it reaches, not the next one up and not an average of two.
That sounds obvious, but quoting from memory drifts. A rep remembers that "big orders get the better price" and applies it to a line of 40 when the break starts at 50. Or a rep forgets a break exists and quotes 200 pieces at the single unit price, which makes the whole quote look expensive next to the house down the street.
Breaks and account pricing
Account pricing usually runs alongside breaks, and the order matters. Settle first which price level applies to this customer: their own contract price, their group price, or the list price. Then apply the breaks that belong to that price level.
Mixing the two is where margin goes. If a contractor already has a contract price, applying a list price break on top of it can give them a lower price than anyone agreed. Write down which breaks apply to which level, and quote that way every time.
Breaks have dates too
Break prices are often tied to a supplier program or a promotion with a start and end date. A break that ended last quarter should not appear on today's quote. A break that starts next month should not either, unless the quote is clearly for delivery after that date.
So every break price needs a valid-from and a valid-until date in the price file, and every quote needs to check them. An expired break that still gets quoted is invisible: the contractor is happy, and nobody sees the cost until the margin review.
The line that sits just under a break
There is one case worth handling deliberately. A contractor asks for 45 of a fitting where the price drops at 50. Do you quote 45, or mention that 50 would cost little more in total?
That is a sales judgment, not a pricing rule, and it belongs to a person. A good habit is to quote exactly what was asked for and add a note on the line when a break is close. The contractor decides. Quietly changing the quantity to hit a break is a fast way to lose trust.
Keep breaks in the price file, not in heads
The reason breaks go wrong is that they often live in people's memories, in an old email from a vendor rep, or in a spreadsheet on one desk. Put every break in the price file, with its quantity, its price, its price level and its dates. Then anyone on the counter quotes the same line the same way, and a manager can check any quote against the file.
When a vendor changes a program, update the file on the day the change takes effect, and give the old breaks an end date instead of deleting them. That way a quote from last month can still be explained.
A quick check for any quote
Before a quote with breaks goes out, check:
- Is the price level right for this account?
- For each line with breaks, does the quantity reach the break used, and is it the highest break reached?
- Are all break prices in date for this quote?
- Is any line just under a break, and does the contractor need to know?
On a long bid list this check is worth doing line by line, because a wrong break is easier to fix before the quote goes out than after.
How I apply breaks in a draft
QuoteClerk AI applies quantity breaks and valid-from and valid-until dates read from your own price file, line by line, after the price order is settled: the customer's own price, then the group price, then the list price. A price tie or a missing price blocks the line, so it is flagged rather than guessed, and a person on your team approves every draft before it reaches the contractor.
The quantity break pricing in quotes page shows how breaks and dates are read from a price file. If you run an electrical distributorship, read the page on electrical distributor quoting software, with prices in US dollars.
Frequently asked questions
Which break applies to a quantity between two breaks?
The highest break the quantity reaches. A line for 120 with breaks at 50 and 100 uses the 100 break.
Should a quantity break apply on top of a contract price?
Only if the contract says so. By default, settle the price level first and apply the breaks that belong to that level, so a contractor does not get two reductions on one line.
What if a break price has expired?
Treat it as gone and use the next valid price. An expired break on a quote is an error, however happy it makes the customer.